Section 08 Horizontal Stabilizer

Page 8-6 to 8-9

Preped all the Horizontal Stabilizer parts by match drilling or final drilling, disassembled the parts, deburred all the holes and rib tabs and primed them with the SEEVENAX primer. Although the elevator hing brackets were almost powder coated, I decided to prime them. Because some of the powder coat is not from a good quality.

Start: 15.02.2017

End: 06.05.2017

Time: 6h

Schreibe einen Kommentar

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert.